现场勘测
先将河宽、进场道路和交通管制条件固定为现场记录。
Project Story
评估老旧桥梁结构安全并制定公共运营维修优先级。 ArcBridge Infra的Metro Link 诊断记录保留河道宽度、进场路线、交通管制和竣工后检查周期。
先将河宽、进场道路和交通管制条件固定为现场记录。
按跨径施工顺序连接上部结构和下部工序。
将传感器、巡检历史和维修优先级纳入维护计划。
Detail Proof
将河道宽度、跨径、施工顺序和检查周期连接成同一现场记录。
Site survey
Access, river width and traffic conditions are recorded first.
Span review
Structural options are compared by safety and sequence.
Build stages
Temporary works, build and inspection flow in order.
Inspection cycle
Maintenance records continue after completion.
Access, river width and traffic conditions are recorded first.
Structural options are compared by safety and sequence.
Temporary works, build and inspection flow in order.
Maintenance records continue after completion.
Before we start
Site command
把勘测、结构、施工和安全标准放在同一屏。
Engineering Record
Bridge projects are presented through structure review, delivery sequence and inspection history, not only completion photos.
Site conditions and substructure are reviewed first.
Superstructure and delivery sequence are connected.
Inspection history and repair priority shape operations.
Infrastructure Span
ArcBridge Infra将服务、验证案例和咨询台连接为一个运营流程,让负责团队依据同一记录行动。
像桥梁剖面一样连接结构、施工和检查。
按风险和审批标准划分施工阶段。
维护数据按生命周期延续。
Site and structure review
Substructure sequence
Delivery and safety phase
Inspection and maintenance
Span Control